Bamboo flooring can replace linoleum, but only if the existing substrate is sound, flat, dry, and compatible with the bamboo product's installation method; the linoleum itself is usually removed or encapsulated rather than simply covered, and the decision turns far more on moisture, subfloor type, and the specific bamboo product than on the fact that linoleum was there before.
What the question actually leaves open
"Linoleum" is used loosely in American English. Strictly, linoleum is a flooring sheet or tile made from linseed oil, cork or wood flour, resin, and mineral fillers, sold under names like Marmoleum. In everyday speech, many people say "linoleum" for any resilient sheet flooring, including vinyl (PVC) sheet and vinyl composition tile. The answer changes somewhat depending on which one is actually on the floor, so identify it first.
Several other details are unknown and materially affect the answer: whether the linoleum sits on a concrete slab or a wood subfloor; whether it is above grade, on grade, or below grade; whether the linoleum is glued down and how well it is bonded; whether there is a plywood or hardboard underlayment beneath it; the room (kitchen and bath versus bedroom); and the type of bamboo product (solid tongue-and-groove, engineered, click-lock floating, or glue-down). The general principle below is answerable; the go/no-go call for a specific floor is not.
Why bamboo is a different animal from linoleum
Linoleum is a thin, dimensionally stable resilient sheet. Bamboo flooring is a wood-based product, whether strand-woven, horizontal, or vertical, and it behaves like wood: it expands and contracts with humidity, it can cup or gap, and it is sensitive to moisture from below and above. That difference drives almost every practical rule.
A floating click bamboo floor moves as a unit and needs room at the perimeter and a flat substrate. A glue-down engineered bamboo is more dimensionally restrained but depends on a clean, sound, absorbent-or-primed surface and a compatible adhesive. Solid bamboo nailed or stapled down requires a wood substrate that holds fasteners. None of these wants to sit over a spongy, crumbly, or damp linoleum installation.
The substrate is the real question
Wood subfloor with linoleum on top
This is the most common residential case, and it is often workable. The concerns are thickness buildup, adhesion, and flatness.
If the linoleum is well bonded, flat, and clean, some manufacturers permit installation over it using a floating system with an underlayment, or by first installing a thin plywood underlayment over it and then nailing or gluing the bamboo. Others require removal. Follow the bamboo manufacturer's written instructions, because warranties are typically voided by unapproved substrates.
If the linoleum is loose, curled, blistered, or has a cushioned backing, remove it. Bamboo over a spongy cushion layer will flex, and click-lock joints will fail. Cushioned vinyl in particular is a poor base.
Old linoleum may also contain asbestos, particularly material installed before the mid-1980s. Asbestos-containing sheet flooring and the black mastic used with some vinyl and linoleum tiles are the classic hazards. Do not sand, grind, or aggressively scrape suspect material; if it is in good condition and can be legally encapsulated under an approved underlayment, that is sometimes the lower-risk path, but confirm local rules and use a qualified abatement professional when removal is required. This is a genuine safety and regulatory issue, not a stylistic one.
Concrete slab with linoleum
Concrete is where bamboo gets difficult. Bamboo over a slab needs a vapor retarder or an approved moisture-barrier system, and the slab's moisture emission must fall within the flooring manufacturer's limit, typically tested rather than guessed. A glue-down engineered bamboo over a properly prepped and moisture-tested slab can work. A solid bamboo nailed down cannot, because there is nothing to nail into.
Linoleum glued to a slab does not function as a vapor barrier. Moisture still moves through or around it, and trapping that moisture under a new bamboo floor is a recipe for cupping, mold, and adhesive failure. The right approach is usually to remove the linoleum, test the slab, apply an appropriate vapor retarder or moisture-mitigation coating, and then install per the bamboo maker's slab instructions. Simply laying bamboo over existing linoleum on concrete is the case most likely to fail.
Below-grade and damp rooms
Bamboo is generally a poor choice for basements and full bathrooms regardless of what is on the floor now, because of sustained humidity and the risk of standing water. Many manufacturers exclude below-grade installations and wet areas from warranty coverage. A powder room or a kitchen with normal spills may be acceptable with a properly sealed product; a basement laundry room usually is not.
Height, transitions, and the things people forget
Adding bamboo over existing linoleum raises the floor. Linoleum is thin, often around 2 mm to 3 mm including backing, but bamboo planks are commonly 10 mm to 15 mm thick, plus underlayment. That difference shows up at doorways, at the base of cabinets, at appliance clearances, and at the toe-kick of a dishwasher. Check that doors still clear the new floor or can be trimmed, that the refrigerator and range still fit, and that a reducer or threshold can bridge to adjacent flooring. In a kitchen, the dishwasher often cannot be removed later if the floor is raised in front of it, so plan that clearance deliberately.
Also account for the transition at the room perimeter: floating bamboo needs an expansion gap hidden under baseboard or quarter round. If the old linoleum ran tight under the baseboard, the new floor's gap may require removing and reinstalling trim.
Removal versus encapsulation
Removing glued linoleum is laborious but gives the cleanest result: you can inspect and repair the subfloor, address moisture, and start the bamboo on a known surface. Encapsulation, meaning leaving the old floor in place and covering it with an approved underlayment, saves time and can avoid disturbing suspect asbestos, but it adds height and depends on the old floor being flat and firmly bonded.
A middle path is to install a thin plywood underlayment over the linoleum and then fasten or glue the bamboo to that. This works on wood subfloors, adds stiffness, and creates a clean nailing surface, but it raises the floor further and is not appropriate over a slab unless the assembly is designed for it.
Scraping or chemical stripping of old adhesive is best avoided as a shortcut; residues can interfere with new adhesive and, with older materials, create exposure hazards.
Product choice matters more than most buyers expect
Strand-woven bamboo is denser and generally more dimensionally stable than traditional horizontal or vertical bamboo, which makes it somewhat more forgiving in humid rooms. Engineered bamboo, with a bamboo wear layer over a plywood or composite core, tends to be more stable than solid bamboo and is often the better candidate for glue-down over a slab. Click-lock floating products are the easiest to install over a flat existing floor but the least tolerant of substrate flex and moisture.
Finish and core quality vary widely. Cheap bamboo with a thin wear layer will show wear quickly in a kitchen, and some early bamboo floors developed problems with finish adhesion and dimensional movement. Buy a product with a clear installation guide that names approved substrates, moisture limits, and whether installation over existing resilient flooring is allowed.
Acclimation and moisture control
Bamboo should be acclimated in the room where it will be installed, in the packaging and at the manufacturer's specified conditions, before installation. Indoor relative humidity should be kept in the range the manufacturer specifies, often roughly 30 to 50 percent, and the home's HVAC should be running. In dry winter climates, bamboo can gap; in humid summers, it can swell. A whole-house humidity strategy is part of a successful bamboo floor, especially in a kitchen.
Where the answer stops applying
The general "yes, with conditions" does not cover every case. It does not authorize installation over wet, loose, cushioned, or asbestos-containing flooring without proper handling. It does not override a manufacturer who forbids installation over existing resilient floors, and it does not make bamboo suitable for a basement bathroom. If the existing linoleum is the finished floor over a slab with no vapor retarder and high moisture readings, the honest answer is that bamboo needs moisture mitigation first, and possibly a different flooring choice. If the room is a busy kitchen with a history of leaks, a resilient or tile floor may simply be the more durable decision.
Practical sequence
Identify the existing flooring and whether it is bonded or loose. Check for asbestos in pre-1980s material before disturbing it. Determine the substrate (wood or concrete) and the room's moisture conditions, testing the slab if applicable. Choose a bamboo product and read its installation instructions for approved substrates and moisture limits. Decide between removal, encapsulation with approved underlayment, or direct installation where permitted. Check door and appliance clearances and plan transitions. Acclimate the bamboo, control indoor humidity, and install with the required expansion gaps and moisture barriers.
Done in that order, replacing linoleum with bamboo is a normal renovation rather than a gamble. Done by laying planks directly over whatever is there, it is one of the more reliable ways to ruin a bamboo floor.